Lake Marble Falls refill starts Monday, March 18
Special to The Highlander
The refill of Lake Marble Falls is scheduled to begin on March 18 and conclude by the end of the day on March 21.
LCRA temporarily lowered lakes LBJ and Marble Falls in December to assist lakeside property owners in recovering from recent historic flooding along the Colorado and Llano rivers. The drawdown made it easier for residents to remove debris, dredge and maintain or repair docks, retaining walls and other infrastructure.
Unforeseen circumstances such as floods or extended power emergencies could prompt LCRA to change or cancel the drawdowns. Equipment and tools should not be left in the lake unattended and should be removed from the lakebed when not in use.